Using better survey data to optimise the design process for new fibre broadband infrastructure
By taking an innovative new approach to collecting survey data that increases survey efficiency, reduces site time by up to 70% and maximises the value of the data it has been possible to truncate the current design process.
This revised process reduces the initial design time, reduces the site data collection time and therefore reduces the cycle time to Low Level Design with an increased build certainty.
This approach of using good quality survey data ahead of any design activity to better influence design accuracy from the outset has shown in two trial areas: